Table 3 Single rebar samples made with fly ash replacement

From: Corrosion of carbon steel rebar in binary blended concrete with accelerated chloride transport

Sample Number

Reservoir Length (cm)

Migration Time

Started

Migration Ending

Date

Total

Ampere

Hour

Duration

days

FA-1

5

07/26/16

01/04/17

4.069

84

FA-2

5

07/26/16

01/04/17

3.015

74

FA-3

5

07/26/16

08/15/16

1.718

16

FA-4

7.5

07/26/16

08/15/16

5.889

16

FA-5

7.5

07/26/16

08/15/16

3.524

25

FA-6

7.5

07/26/16

09/05/16

3.729

30

FA-7

17.5

07/26/16

11/28/16

8.145

64

FA-8

17.5

07/26/16

01/04/17

6.942

74

FA-9

17.5

07/26/16

12/09/16

6.676

65

FA-10

2.5

07/26/16

12/09/16

2.742

64

FA-11

2.5

07/26/16

12/09/16

3.531

73