Table 2 Single rebar samples made with slag replacement

From: Corrosion of carbon steel rebar in binary blended concrete with accelerated chloride transport

Sample Number

Reservoir Length (cm)

Migration Time

Started

Migration Ending

Date

Total

Ampere

Hour

Duration

days

SL-1

17.5

07/29/16

09/05/16

1.701

27

SL-2

17.5

07/29/16

01/04/17

1.47

50

SL-3

17.5

07/26/16

08/15/16

3.162

16

SL-4

2.5

07/26/16

01/10/17

3.66

54

SL-5

2.5

07/26/16

01/04/17

3.701

82

SL-6

5

07/26/16

01/04/17

4.016

84

SL-7

5

07/26/16

01/04/17

2.482

64

SL-8

5

07/26/16

01/04/17

2.351

84

SL-9

10

07/26/16

01/04/17

4.282

82

SL-10

10

07/26/16

01/04/17

2.369

55

SL-11

10

07/26/16

12/09/16

3.438

49