From: Impact of rest time on creep recovery of asphalt mixtures modified with calcined marl filler
Description | Mean | Variance | t-stand | P(T<=t) | T critical one tail | P(T<=t) two tail | T critical two tail |
---|---|---|---|---|---|---|---|
Without rest time | 48.8 | 14.135 | -3.15747 | 0.006784 | 1.859 | 0.013588 | 2.306 |
With rest time | 55.38 | 7.662 |