From: Life-cycle cost analysis of bridges subjected to fatigue damage
Cost item
Cost
C0 [15]
€ 4.084.801
CSHM,0 [41]
€ 60.000
Cm [43]
€ 40.848,01
CSHM,m [43]
€ 12.000
CSHM,r [43]
€ 24.000
cj [15]
€ 4.493.281,10
cr [44]
€ 449.328,11
Ci [45]
€ 11.439,65